Skip to main content
    Back to Resource Library

    PDSA & Quality Improvement

    FQHC PDSA Example: Improving Hypertension Control

    A worked structure for a hypertension control improvement cycle, from aim statement through the documented decision.

    By Jessica R. Smith, BSN · Updated · 8 min read

    An illustrative cycle, not a benchmark

    The structure below is an example of how a hypertension control cycle can be written. The numbers a health center uses should be its own; nothing here is a performance claim or a target set by any external body.

    Plan: the aim and the test

    Name the population, the measure, the change being tested, and who is running it. A common shape: adult patients with a hypertension diagnosis seen in the last period, tested against a repeat-BP workflow at rooming.

    • Measure: hypertension control rate as your health center defines it for reporting
    • Owner: one named clinical or nursing lead
    • Test period: a defined number of weeks at one site or one pod
    • Decision rule: written before the test begins

    Do: run it small and record what actually happened

    Record deviations as they occur. The reasons a workflow did not happen as designed are usually the most useful part of the cycle.

    Study and Act: the part that gets skipped

    Compare performance to the periods before the test, note confounders honestly, then write the adopt, adapt, or abandon decision with a date and an owner.

    If the measure itself looks unreliable, the denominator troubleshooting sequence is usually the right detour before drawing conclusions.

    Run a cycle in MeasureWise

    Start from a hypertension template and keep the evidence trail as you go.

    Run a cycle in MeasureWise

    Official sources

    Related resources

    Keep one clean record of your quality work

    Document the intervention, study the result, and keep the decision with the evidence.

    14-day free trial No sales call Monthly aggregate values only